Industrial automation · Consulting and implementation

We automate plant that cannot stop to be automated

Control systems, process lines, robotic cells and the data layer above them — assessed on your floor, designed before anything is built, and commissioned inside the shutdown window you actually have. You keep the source, the drawings and the credentials.

Rung 000 · How a project runs
ASSESSDESIGNIMPLEMENTCOMMISSIONSUPPORTPLANT RUNNING
Sequence

Nothing is built before the design is signed

The stages are numbered because they genuinely run in order. Each one ends with a document you own, and each one is a point where you can stop.

  1. 01

    Assess

    We walk the plant, read the drawings and watch a shift before proposing anything.

    You end up with: An assessment report with a costed shortlist and the option to stop.

    1–3 weeks
  2. 02

    Design

    The functional design specification is the contract. Nothing gets built ahead of it.

    You end up with: A signed FDS and test plan you own, usable by any integrator.

    2–6 weeks
  3. 03

    Implement

    Code, panels and screens are built and tested off-plant while you keep producing.

    You end up with: A FAT-passed system and a test record showing what was proved.

    4–16 weeks
  4. 04

    Commission

    Installation is planned to your window, with a tested rollback at every stage.

    You end up with: A SAT sign-off, as-built documentation and trained operators.

    Shutdown window
  5. 05

    Support

    A run-in period, then whatever level of cover you actually need — including none.

    You end up with: Full handover. You can continue with us, your own team, or anyone else.

    Ongoing, by agreement
Straight answers

What we will tell you no about

An integrator paid to install things has a reason to find things to install. These are the cases where we would rather lose the job.

  • Automating an incapable process

    If the variation is mechanical or in the raw material, control will only make the variation faster. That gets fixed first.

  • Dashboards over untrusted data

    Plotting a drifting instrument produces confident wrong decisions. Instrumentation is verified before anything is charted.

  • A cell that will idle

    Low volume with frequent changeovers often pays back slowly. We run the numbers with you before quoting hardware.

  • A retrofit on plant you are replacing

    If the line goes in two years, the retrofit rarely returns its cost. We say so before the quote, not after.

  • Certifications we cannot evidence

    We do not claim accreditations we do not hold. Safety-related design is done with a qualified assessor and the assessment is handed to you.

Where we work

Plant types we know

The constraint is rarely the same twice. These are the settings where we have engineered before and know what usually turns out to be the real problem.

IND-01

Discrete manufacturing

Assembly, fabrication and packaging lines where changeover time and traceability decide the day's output.

IND-02

Process and chemicals

Batch and continuous plant where the control philosophy, not the hardware, is usually what limits consistency.

IND-03

Food and beverage

Lines with hygiene, changeover and shelf-life constraints, where records have to stand up to an audit.

IND-04

Warehousing and intralogistics

Conveying, sortation and palletising where the constraint is usually the interface to the WMS, not the mechanics.

IND-05

Utilities and building services

Water, compressed air, HVAC and energy systems where a small control change usually beats new plant.

Asked before the first call

Questions we get early

Do you supply hardware, or only engineering?

Both, but they are quoted separately so you can see what the engineering costs. We are not tied to a single controller vendor. If you already standardise on a platform, we work in it; if you do not, we recommend one and explain the trade-off.

Who owns the code and the drawings?

You do. Source code, HMI projects, tag lists and as-built drawings are handed over in full at the end of the project, with no licence conditions that force you back to us. That is stated in the contract, not just here.

Can you work on a plant that cannot stop?

That is the normal case. Development and testing happen off-plant, cutover is staged to your shutdown window, and every stage has a rehearsed way back to the previous system. The rollback is part of the plan, not a contingency.

What certifications do you hold?

We do not publish certification claims we cannot evidence. Safety-related design is carried out with a qualified functional-safety assessor engaged for the project, and the assessment is documented and handed to you. If a certification is a procurement requirement, tell us early and we will say plainly whether we meet it.

How do you price a project?

Assessment is a fixed fee. Design is fixed once the assessment defines the scope. Implementation is fixed against the signed functional design specification, with variations priced in writing before they are done. We do not quote implementation before a design exists — a number given at that point would be a guess.

Next step

Start with a walk of your plant

Tell us what is happening on the floor in a sentence. The first reply is normally a scope question, not a price — a number before that would be a guess. Assessment is a fixed fee and you can stop after the report.