Blog

Notes from the plant floor

Sober, practical articles on automation projects: how to specify them, how to measure what they change, and how to reduce the risk on plant that has to keep running.

FeaturedPlant Data7 min read

How Do You Alert When ERP-to-Shop-Floor Handoffs Fail?

Detect lost, duplicate, late and rejected production orders between ERP and the shop floor, route each alert to a named owner, retry safely and fall back to people.

TB
ThynkBlox Automation Team
November 15, 2026
23 posts

Control Systems

PLC, SCADA and MES integration, control logic and alarm handling.

Control Systems7 min read

DCS vs PLC: What's the Difference for Your Plant?

A DCS is built for continuous process control across a plant; a PLC for fast, discrete machine control. Compare use, scale, redundancy and engineering approach before choosing.

ThynkBlox Automation Team·November 8, 2026
Control Systems7 min read

Safety PLC vs Standard PLC: When Do You Need One?

A safety PLC is built to perform safety functions with diagnostics and fault tolerance a standard PLC does not claim. Whether you need one follows from the machine's risk assessment.

ThynkBlox Automation Team·November 8, 2026
Control Systems8 min read

PLC or Industrial PC for Machine Control? How to Decide

Compare PLCs and industrial PCs on determinism, lifecycle, maintenance skills, vision and data work, and the cost of change. Many machines are best served by a hybrid, with each device doing what it handles well.

ThynkBlox Automation Team·November 8, 2026
Control Systems5 min read

ISA-95 Explained: Where MES Fits Between the PLC and the ERP

ISA-95 gives plants a shared map of who does what, from sensors to the ERP. This guide explains the levels, where MES sits, and how to use the model to plan an integration project.

ThynkBlox Automation Team·November 3, 2026
Control Systems7 min read

Why Does a PID Control Loop Keep Oscillating?

An oscillating PID loop may have a measurement, valve or process problem. Learn which trends to capture, how to separate likely causes, and when changing the tuning is justified.

ThynkBlox Automation Team·November 1, 2026
Control Systems7 min read

How Should You Separate Machine and Office Networks?

Define machine network boundaries around production needs, then permit only agreed traffic. Plan the inventory, firewall rules, engineering access and tests before changing a live plant network.

ThynkBlox Automation Team·November 1, 2026
Control Systems7 min read

How Do You Keep Batch IDs Consistent Across Plant Systems?

Define one batch identity and clear rules across PLC, SCADA and MES for starts, ends, splits, rework and corrections, so each record stays attributable.

ThynkBlox Automation Team·October 26, 2026
Control Systems7 min read

Which HMI Permissions Should Operators Have?

Assign HMI access by operating duty and the consequence of each action, separating operator, maintenance and administrator rights on shared terminals.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Do You Prevent Duplicate MES Commands to a PLC?

Give each command a stable identity, separate acceptance from completion and reconcile uncertain results before retrying a command to a PLC.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Should You Control Machine Recipe Changes?

Treat recipes as approved parameter versions: define who can edit them, how limits are checked, what confirms a download and when a version takes effect.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Should ERP Orders Reach the Shop Floor?

Define who releases production orders, how the shop floor reports actual progress, and what happens when orders change, materials do not match or messages fail.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How to Troubleshoot High PLC Scan Time

Use controller diagnostics to separate slow logic, periodic-task interference and communication load, then test one change at a time.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

What Should an HMI Show When a Machine Will Not Start?

A useful HMI shows which start conditions are unmet, whether the controller accepted the command and where the sequence is waiting.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

When Does a SCADA System Need Redundancy?

Decide on SCADA redundancy by what the plant loses in a failure: server and network dependencies, local control, failover and the tests that prove recovery.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Should Vendors Get Remote Access to Plant Controls?

Give vendors approved, time-limited access through one controlled entry point, with defined reach, recorded sessions and separate change approval.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How to Choose an Industrial Protocol Gateway

Choose a gateway by what it preserves between systems: addresses, data types, byte order, diagnostics and failure behaviour, proven by acceptance tests.

ThynkBlox Automation Team·October 25, 2026
Control Systems8 min read

How Should You Back Up and Restore PLC Programs?

A usable PLC backup holds the program, hardware configuration, software and access needed to restore it. Use this checklist and prove it with a restore test.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

What Should a PLC Do When Communication Fails?

Define communication-loss behaviour for each equipment interface: detect the failure, reject stale commands, manage local control and recover without a restart.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

SCADA vs MES: What Each System Does in a Plant

SCADA supervises the process; MES manages production execution. See where they overlap, what data they share and how to split roles before integrating.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Do You Control PLC and HMI Program Versions?

Keep an approved baseline, record online edits and release PLC and HMI projects together. How to identify what is running and prepare a recovery package.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Should a Machine Restart After a Power Failure?

Base restart behaviour on the machine's physical state and the interrupted step. Decide which values to trust, how to recover position and what to check.

ThynkBlox Automation Team·October 25, 2026
Control Systems7 min read

How Should Manual and Automatic Machine Modes Work?

Define what each machine mode permits, which station owns commands and how the sequence behaves on transfer, so operation and restart behaviour are clear.

ThynkBlox Automation Team·October 25, 2026
Control Systems4 min read

Alarm Management: Why Operators Ignore Alarms and How to Fix It

When a control system raises too many alarms, operators stop trusting any of them. Here is why alarm floods happen, what a well-designed alarm looks like, and how to clean up an existing system.

ThynkBlox Automation Team·October 11, 2026
26 posts

Plant Data

Machine data, historians, OEE and dashboards people can trust.

Plant Data7 min read

MQTT vs OPC UA: Which Should Carry Your Plant Data?

MQTT moves messages through a broker using publish/subscribe. OPC UA gives structured, browsable access to plant data. Compare communication, data models, security and fit, and why plants use both.

ThynkBlox Automation Team·November 8, 2026
Plant Data7 min read

What Is a Digital Twin in Manufacturing, Really?

A digital twin is a model of a machine, line or process kept connected to real plant data. Learn its three practical levels and the data you need before building one.

ThynkBlox Automation Team·November 8, 2026
Plant Data7 min read

Predictive vs Preventive Maintenance: What's the Difference?

Preventive maintenance follows a schedule of time, runtime or cycles. Predictive maintenance acts when measured condition shows a problem. Compare triggers, data needs and costs per asset.

ThynkBlox Automation Team·November 8, 2026
Plant Data7 min read

How to Clean Plant Data Before Building Dashboards

Check tag names, units, timestamps, missing values, outliers and quality flags before you draw a single chart. Document each cleaning rule and keep the raw data untouched so every dashboard figure can be traced back.

ThynkBlox Automation Team·November 8, 2026
Plant Data7 min read

How to Keep Instrument Calibration Records That Support Plant Data

Record each instrument's tag, range, method, as-found and as-left values, date, next due date and who did the work. Then link those records to the historian so data users can see when readings were reliable.

ThynkBlox Automation Team·November 8, 2026
Plant Data5 min read

OPC UA Explained for Plant Managers

OPC UA is a common way for machines, control systems and software to exchange data. This guide explains what it does, how it compares with MQTT and older protocols, and what to ask before a plant data project.

ThynkBlox Automation Team·November 3, 2026
Plant Data7 min read

How Do You Detect Sensor Drift in Plant Data?

Investigate plausible but inaccurate readings using reference measurements, independent sensors and calibration records. Then carry the uncertainty into dashboards and reports until the reading is verified.

ThynkBlox Automation Team·November 1, 2026
Plant Data7 min read

Why Do Plant Systems Show Different Event Times?

When PLC, SCADA and historian timestamps disagree, check the clocks and what each recorded time means. Separate clock errors, time zones and collection delays.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How Do You Keep Plant Data During a Network Outage?

Buffer records near the equipment and forward them on reconnection. Define buffer capacity, timestamps, duplicate handling and what happens when storage fills.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How Often Should You Sample Machine Data?

Choose sampling intervals around the shortest event you need to see. Separate slow trends from brief states, use event capture, and test controller load.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

Why Are There Gaps in Your Historian Data?

Missing historian data can start at the signal, collector, archive or dashboard. Trace one tag and time window through each stage before deciding what failed.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

Why Do Machine Counts Differ From Production Reports?

Before correcting a production total, check what each counter measures, when it resets, and how rejects, rework, pack sizes and cutoffs affect the comparison.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How Long Should You Keep Plant Historian Data?

Set historian retention by the decisions each record supports: separate raw readings from summaries, keep investigation records and assign deletion owners.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How to Set Historian Deadbands Without Hiding Events

Set historian deadbands around meaningful process changes, then check the stored trace against original readings so compression does not hide short excursions.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How Do You Standardise Engineering Units in Plant Data?

Define the unit, scaling rule and conversion owner for every measurement, then check the path from instrument to dashboard so no unit mismatch hides.

ThynkBlox Automation Team·October 26, 2026
Plant Data7 min read

How to Capture Machine Downtime Automatically

Use machine signals to record when a stop starts and ends, then let operators confirm the reason. Set thresholds and handle short stops and overlapping causes.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Can You Collect Data From an Existing PLC?

Start with a supported read interface and a small tag list. Check connection capacity, polling limits and access before collecting data in a running plant.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

SCADA Logging vs Historian: What Does Your Plant Need?

Start with the questions your plant must answer. Compare SCADA logging with a separate historian on retrieval, retention, compression, context and upkeep.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Should You Structure Downtime Reason Codes?

Build a short downtime reason hierarchy with clear boundaries. Learn how to handle ambiguous stops, planned work, unknown causes and changes to the code list.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

What Should a Production Shift Dashboard Show?

A shift dashboard should show progress against plan, current constraints, data freshness and the next action. How to choose the main view and drill-downs.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Can You Measure Energy Use by Production Line?

Set a clear metering boundary, then match energy readings to production records. Where to place meters, track idle use and allocate shared services openly.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Do You Schedule Maintenance From Machine Runtime?

Define which hours count, agree the service interval and tie each trigger to a completed-work record. Covers counter resets, overdue work and handover.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Should Production Teams Access Historian Data?

Give production teams historian data through role-based reporting access. Define visible tags, export rights, query limits and access removal.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Can You Monitor a Machine With No Data Output?

Start with the state you need, then choose an external sensor. How to assess current sensing, discrete sensors, installation and validation.

ThynkBlox Automation Team·October 25, 2026
Plant Data7 min read

How Do You Add Product and Shift Context to Machine Data?

Link machine records to the product, order and shift active at each event. Define time boundaries, changeovers and correction rules for fair comparison.

ThynkBlox Automation Team·October 25, 2026
Plant Data4 min read

OEE Explained: What the Number Tells You and What It Hides

Overall equipment effectiveness combines availability, performance and quality into one figure. Here is how it is calculated, why a single OEE number can mislead, and how to collect data you can trust.

ThynkBlox Automation Team·September 27, 2026
26 posts

Projects & Retrofits

Assessments, functional design specifications, brownfield retrofits, commissioning and handover.

Projects & Retrofits7 min read

Which Plant Process Should You Automate First? A Scorecard

Score candidate processes on frequency, cost of errors or downtime, stability, data availability and safety impact, then start with a stable, well-understood process that repeats often.

ThynkBlox Automation Team·November 15, 2026
Projects & Retrofits7 min read

How Do You Map a Production Process Before Automating It?

Map the process on one page with swimlanes for operator, machine, MES and ERP. Record every step, handoff, data item and decision, then hunt down workarounds before writing a specification.

ThynkBlox Automation Team·November 15, 2026
Projects & Retrofits7 min read

RPA or a Proper Interface for Legacy Plant Software?

Compare screen-driven RPA with a proper database, file or API interface on stability, change risk, error visibility, audit and maintenance, then use the decision table to choose.

ThynkBlox Automation Team·November 15, 2026
Projects & Retrofits7 min read

What Drives the Cost of a Plant Automation Project?

Automation cost comes from scope, I/O count, site condition, integration depth, documentation, commissioning, training and support. See how each moves the price and how to get comparable quotes.

ThynkBlox Automation Team·November 15, 2026
Projects & Retrofits7 min read

How to Write a PLC I/O List for a Retrofit

Build a PLC I/O list with consistent columns, verify every point against the installed plant, and agree the list before programming starts. Includes a sample template table and common mistakes.

ThynkBlox Automation Team·November 8, 2026
Projects & Retrofits8 min read

A VFD Commissioning Checklist: From Nameplate to Handover

A sequence for commissioning a variable frequency drive: nameplate and parameter entry, safe-state checks, direction and ramp tests, stop and fault behaviour, PLC communication, parameter backup and handover records.

ThynkBlox Automation Team·November 8, 2026
Projects & Retrofits7 min read

Is Your Site Ready for a Controls Installation?

Check power, earthing, cable routes, panel access, utilities and permits before booking installation crews. Use a readiness register to record evidence, assign owners and resolve blockers.

ThynkBlox Automation Team·November 1, 2026
Projects & Retrofits7 min read

What Should an Instrument Loop Check Include Before Startup?

Trace each instrument signal through field wiring, PLC scaling and operator displays. Define test points, verify the associated response, record discrepancies and account for every temporary force before startup.

ThynkBlox Automation Team·November 1, 2026
Projects & Retrofits7 min read

What Files and Access Should a Controls Handover Include?

Before accepting a PLC or SCADA handover, require editable source files, current configurations, software rights and access, confirmed by a witnessed check.

ThynkBlox Automation Team·October 26, 2026
Projects & Retrofits7 min read

Can You Reuse an Existing Control Panel in a Retrofit?

An existing panel may suit a PLC retrofit, but reuse needs more than spare space. Check enclosure, heat, power, wiring and access, with qualified review.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What Should a Plant Network Survey Check Before Expansion?

Before connecting new equipment, establish the network's actual layout, ports, addressing, traffic paths and cable condition, and plan checks around production.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What Costs Get Missed in a Control System Project Budget?

Budget for the complete installed and supported system. Agree who pays for licences, panel work, field repairs, site access, training and recurring charges.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

How Should You Manage a Controls Commissioning Punch List?

Give every commissioning defect an owner, a consequence and a testable closure condition. Separate start-up blockers from deferred work and record retests.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

When Should You Roll Back a Control System Cutover?

Set measurable rollback triggers, name the decision-maker and test the recovery path before a PLC retrofit begins. Know which changes close the route back.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What Operator Training Is Needed Before Controls Handover?

Prepare operators for start-up, changeovers, faults and recovery on the new PLC and SCADA system, and use observed practice across shifts to check readiness.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What Should a Plant Automation Support Agreement Cover?

A PLC and SCADA support checklist covering authorised requests, service hours, response commitments, remote access, site attendance and restoration work.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

Which Control System Spares Should a Plant Keep?

Build a PLC spares list around failure consequences, procurement delays and replacement readiness, including compatible hardware and tested backups.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

How Should PLC Changes Be Approved After Commissioning?

Use a documented request, impact review, approval and acceptance process for changes to a running plant, with emergency limits and records to close each change.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

When Does a Machine Retrofit Need a Safety Assessment?

Bring a qualified assessor into retrofit planning when hazards, modes or protective functions may change. Define the boundary and agree validation duties early.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

How Do You Assess a Plant With Missing Control Drawings?

Start with a verified record of equipment, wiring and software, then document unknowns and agree a modification scope when control drawings are missing.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

How to Choose a System Integrator for a Plant Project

Compare system integrators by how they define scope, prove system behaviour and prepare your team for handover. Questions for proposals, references and support.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

Which Obsolete Control Equipment Should You Replace First?

Prioritise obsolete PLCs by what a failure would stop, whether a replacement exists and how hard recovery is. Assess support, spares and source code first.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What Should a Control System Site Acceptance Test Cover?

A checklist for testing an installed control system: field signals, site utilities, sequences, failure recovery, witnessed results and acceptance limits.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits7 min read

What a Factory Acceptance Test Should Cover

A factory acceptance test checklist: test plan, I/O, sequences, alarms, failure modes, punch list and sign-off, and where FAT ends and site testing begins.

ThynkBlox Automation Team·October 25, 2026
Projects & Retrofits5 min read

How to Plan a PLC Retrofit Around a Shutdown Window

Replacing an obsolete controller on a plant that has to keep producing takes planning long before the shutdown. Here is how to stage the work, test off-plant and keep a way back at every step.

ThynkBlox Automation Team·October 11, 2026
Projects & Retrofits4 min read

What a Functional Design Specification Should Contain

A functional design specification describes what an automation system will do before anyone builds it. Here is what a useful FDS covers, what is often left out, and why it should be signed before any code is written.

ThynkBlox Automation Team·September 26, 2026