Why do operators ignore alarms?

Operators ignore alarms when most of the alarms they see need no action. After enough of them, a real alarm looks the same as the false ones. This is a design problem, not an operator problem. An alarm system is meant to tell a person that something needs their attention now. If it is asked to report everything that has changed, it stops doing that job.

The risk is highest in the worst moments. When a process is upset, one fault often sets off many alarms in a few minutes. This is called an alarm flood. The operator has to find the one that matters while the screen fills with consequences of it.

What makes a good alarm?

A useful alarm meets four conditions:

  • It needs a response. If the operator cannot or should not do anything, it is a status message, not an alarm.
  • It is clear. The text says what is wrong and where, in words operators use.
  • It is timely. It appears early enough for the response to matter.
  • It has a defined action. Someone has written down what the operator is expected to do and why the alarm exists.

The first condition is the one most often failed. A pump that has been stopped on purpose should not raise an alarm because it is not running.

Where do too many alarms come from?

Most nuisance alarms have a small number of causes.

  • Alarms added by default. Every instrument gets a high and a low alarm during engineering, whether or not an operator can act on either.
  • Limits set too close to normal. A value that wanders a little in ordinary running keeps crossing its limit.
  • No dead-band or delay. A noisy signal that hovers around its limit raises and clears the same alarm again and again.
  • Alarms that ignore equipment state. Alarms on a machine that is stopped, in maintenance or running a different product are not suppressed.
  • Duplicates. One fault is reported at the sensor, the drive, the line and the area.
  • Alarms added after incidents. Each one made sense when it was added. Nobody removed any.

How do you clean up an existing alarm system?

  1. Collect the alarm history. Look at which alarms occur most often and how long they stay active. A short list of alarms usually accounts for a large share of all events, and fixing that list gives the largest improvement.
  2. Review each alarm with operators. For every alarm, ask what the operator does when it appears. If the answer is nothing, remove it, or turn it into a message or a log entry.
  3. Set priorities on purpose. Use a small number of priority levels and define what each means in terms of consequence and time available. Most alarms will not be the highest priority.
  4. Fix the causes of repeats. Add a dead-band or on-delay to noisy signals, adjust limits, and suppress alarms on equipment that is not in use.
  5. Document each alarm. Record the cause, the consequence, the expected action and the limit. Keep this with the control philosophy so it can be reviewed.
  6. Change alarms under control. Once the system is tidy, set a rule that alarms are added, changed or disabled only through a recorded review.

For the screens operators use after an alarm, see what an HMI should show when a machine will not start.

Which standards apply?

ISA-18.2, published internationally as IEC 62682, describes a lifecycle for managing alarm systems in the process industries, from design through to monitoring and change control. It is a useful common language for specifying and reviewing an alarm system. Using it as a reference is not a claim that a system is certified or compliant. Alarms that protect people or equipment from serious harm are a safety matter, and their design should be carried out with a qualified functional-safety assessor.

Where does alarm design belong in a project?

Alarm design is cheapest at the specification stage. Each alarm, its priority and the operator action should be listed in the functional design specification, so that alarms are chosen rather than inherited from a default template. Our guide to what a functional design specification should contain covers the alarm section in context. For an existing plant, alarm rationalisation is part of our process automation work.

Related reading: defining PLC behaviour on communication loss.


Operators ignoring alarms on your plant? Our process starts with a fixed-fee assessment that includes a review of alarm history, and our FAQ explains what you receive and own at the end.

Next step

Want to apply this to your plant?

Every project starts with a fixed-fee assessment, and you can stop after the report.