Industries

The constraint is rarely where you expect

These are the plant types we have engineered in. For each one, the list below is not a capability claim — it is the set of problems that most often turn out to be the actual limit on output, ahead of whatever the site originally asked us to automate.

IND-01

Discrete manufacturing

Assembly, fabrication and packaging lines where changeover time and traceability decide the day's output.

What we usually find first

  • Changeover done by memory, so the same product runs differently on each shift
  • Downtime recorded on paper and reconciled a week later
  • Serial and batch traceability that breaks at the first manual step
IND-02

Process and chemicals

Batch and continuous plant where the control philosophy, not the hardware, is usually what limits consistency.

What we usually find first

  • Recipes held in spreadsheets and typed into the HMI by hand
  • Alarm floods during upsets, so real alarms are missed
  • Loops left in manual because nobody has retuned them since installation
IND-03

Food and beverage

Lines with hygiene, changeover and shelf-life constraints, where records have to stand up to an audit.

What we usually find first

  • CIP cycles run to fixed timers instead of measured end-points
  • Batch records assembled manually before every audit
  • Fillers and packers that stop each other for reasons nobody logs
IND-04

Warehousing and intralogistics

Conveying, sortation and palletising where the constraint is usually the interface to the WMS, not the mechanics.

What we usually find first

  • Scanners and PLCs that disagree about what is on the belt
  • Manual palletising that sets the pace of the whole outbound dock
  • No usable record of where a mis-routed item actually went
IND-05

Utilities and building services

Water, compressed air, HVAC and energy systems where a small control change usually beats new plant.

What we usually find first

  • Compressors running against each other instead of in sequence
  • Energy billed as one number with no way to attribute it to a line
  • Standby plant that has never been proved to start under load

Not on this list?

Say what the plant does and what it runs on. If we have not worked in that setting we will tell you, and either bring in an engineer who has or point you to someone better placed. We do not learn an industry at your cost.

Next step

Tell us about your plant

A sentence about what it makes and what it runs on is enough to start. The first reply is a scope question, not a price.