Five disciplines, quoted separately

Every project here starts with an assessment and a signed functional design specification. Below is what each discipline actually delivers at handover — and the case where we would tell you not to buy it.

Assessment
Fixed fee, stop after it
Design
Signed before any build
Handover
Source, drawings, credentials
Vendor
Not tied to one platform
PLC-100

PLC, SCADA and MES integration

Control logic, operator screens and the link up to your production system, built as one job so the numbers on the HMI and the numbers in the office agree.

Delivered at handover

  • PLC program with commented, version-controlled source you keep
  • SCADA or HMI screens built around the operator's real task order
  • Tag list and I/O schedule maintained as a document, not tribal knowledge
  • MES or ERP interface with an agreed message contract and failure behaviour
  • Factory and site acceptance tests written before the code is

When this is the wrong answer

If you only need a single machine to run a fixed recipe and nothing has to be reported anywhere, a control panel refresh is cheaper than an integration project. We will say so.

PRC-200

Process automation

Sequencing, interlocks, batch control and closed-loop regulation for continuous and batch processes, specified from your P&IDs and how the plant is actually run.

Delivered at handover

  • Functional design specification signed off before any code is written
  • Sequence and interlock matrix traceable to each cause and effect
  • Loop tuning record with before and after traces
  • Alarm rationalisation so operators see events they can act on
  • Operator and maintenance handover sessions on your plant, not a slide deck

When this is the wrong answer

Process control cannot fix a process that is not capable. If the root cause is mechanical or a raw-material variation, automation will only make the variation faster.

RBT-300

Robotic cells and material handling

Pick-and-place, palletising, machine tending and inspection cells — from cycle-time study and layout through integration, guarding and commissioning.

Delivered at handover

  • Cycle-time and reach study before hardware is quoted
  • Cell layout, fixturing and end-of-arm tooling specification
  • Robot programs and the PLC handshake that supervises them
  • Safety design carried out with a qualified assessor and documented
  • Line-side training so your team can teach new positions without us

When this is the wrong answer

Low-mix, low-volume work with frequent changeovers often pays back slowly. We would rather run the numbers with you and recommend against it than sell a cell that idles.

IOT-400

IIoT and the plant data layer

Getting machine data off the floor once, cleanly, and into a form that reporting, OEE and maintenance can all use — instead of five systems polling the same PLC.

Delivered at handover

  • Edge gateway and protocol design (OPC UA, Modbus, MQTT and the legacy ones)
  • A named, documented tag model so a signal means the same thing everywhere
  • Historian or time-series store with a stated retention policy
  • OEE, downtime and energy dashboards built from that single model
  • Network segmentation between control and business layers, written down

When this is the wrong answer

Dashboards on top of untrusted data make bad decisions faster. If instrumentation is missing or drifting, that gets fixed before anything is plotted.

RTF-500

Retrofit and brownfield modernisation

Replacing obsolete controllers, drives and panels on plant that has to keep producing — planned around your shutdown window, with a tested way back.

Delivered at handover

  • Obsolescence and spares-risk survey across the installed base
  • Migration plan staged to real shutdown windows, with a rollback at each stage
  • As-found documentation for equipment where drawings were lost
  • Panel, wiring and drive replacement with pre-tested spare configurations
  • Post-changeover run-in period with us on site or on call

When this is the wrong answer

If a line is due for replacement inside two years, a retrofit rarely pays for itself. We will tell you before quoting it.

Next step

Not sure which one you need

That is the normal starting point. Describe what is happening on the floor and we will say which discipline the problem actually belongs to — including when the answer is none of them.