Do you supply hardware, or only engineering?
Both, but they are quoted separately so you can see what the engineering costs. We are not tied to a single controller vendor. If you already standardise on a platform, we work in it; if you do not, we recommend one and explain the trade-off.
Who owns the code and the drawings?
You do. Source code, HMI projects, tag lists and as-built drawings are handed over in full at the end of the project, with no licence conditions that force you back to us. That is stated in the contract, not just here.
Can you work on a plant that cannot stop?
That is the normal case. Development and testing happen off-plant, cutover is staged to your shutdown window, and every stage has a rehearsed way back to the previous system. The rollback is part of the plan, not a contingency.
What certifications do you hold?
We do not publish certification claims we cannot evidence. Safety-related design is carried out with a qualified functional-safety assessor engaged for the project, and the assessment is documented and handed to you. If a certification is a procurement requirement, tell us early and we will say plainly whether we meet it.
How do you price a project?
Assessment is a fixed fee. Design is fixed once the assessment defines the scope. Implementation is fixed against the signed functional design specification, with variations priced in writing before they are done. We do not quote implementation before a design exists — a number given at that point would be a guess.
How long before we see anything running?
The assessment report lands in one to three weeks. For most projects, something is running in simulation during design and demonstrable at factory acceptance testing before it ever reaches your floor.
Do you take over systems another integrator built?
Yes, and it starts with an as-found survey rather than a quote. Undocumented code takes time to read. We charge for that survey and you are free to stop after it with the documentation in hand.
What happens to our network security?
Control and business networks are segmented, remote access is time-bound and logged, and default credentials are replaced. We write down what we changed. We are automation engineers, not a security audit firm — if you need a formal assessment, we will say so rather than imply we performed one.
Can you support us after handover?
Optionally. Every project includes a defined run-in period. After that a support retainer is available, but handover is complete either way — you are never dependent on us to keep the plant running.