Examples

Worked examples, not client logos

Everything below is illustrative. These are scenarios written to show how we would approach a job and how success would be defined before it starts. They are not customer case studies, and no client is named or implied. Real project references are shared on a call, with the client's permission.

Read this first. Every scenario on this page is written by us as an illustration. No figures on this page are measured results, and no organisation described here is a real client. We would rather show you how we think than publish numbers we cannot evidence.

EX-01Illustrative — packaging line, three shifts

Downtime you can act on

The situation

Stoppages are written on a clipboard and typed up weekly. Everyone agrees the line is slow; nobody agrees on why.

How we would run it

  • Read existing PLC states rather than adding sensors, where the signals already exist
  • Define a downtime reason model with the shift leaders before any screen is drawn
  • Operator prompt at the machine to classify stops longer than an agreed threshold
  • One dashboard per audience: line, shift, plant — not one dashboard for all three

How success is defined

Success is agreed before the work starts: the top three loss reasons for a week can be produced without anyone reconciling paper.

EX-02Illustrative — obsolete controller on a continuous process

A retrofit that fits the shutdown

The situation

The controller is out of support and spares come from the second-hand market. The plant cannot stop for more than one weekend.

How we would run it

  • As-found survey and re-documentation of a system whose drawings were lost
  • New system built and tested off-plant against the old sequence
  • Parallel wiring staged so each section can be reverted within the window
  • Rehearsed cutover with a written go/no-go point on the Saturday

How success is defined

Success is agreed before the work starts: production restarts within the window, or the rollback is executed and nothing is lost.

EX-03Illustrative — end of line, mixed case sizes

A palletising cell that pays back

The situation

Manual palletising sets the pace of the dock and the case mix changes weekly.

How we would run it

  • Cycle-time and reach study against the real case mix before quoting hardware
  • Gripper and pattern strategy chosen for changeover time, not peak speed
  • Safety assessment carried out with a qualified assessor and documented
  • Pattern teaching handed to the line team so new cases need no integrator visit

How success is defined

Success is agreed before the work starts: the cell sustains the line rate across the real case mix, and your team can add a pattern unaided.

Next step

Ask for real references

On a call we can put you in touch with sites we have worked on, where the client has agreed to it. We do not publish names or numbers here without that permission.